Documentation Article #1 - Technical Grounding Manual
Does Elesium comply with RBI Cyber Security Framework Annex II for commercial banks?
Yes, Elesium complies with RBI Cyber Security Framework Annex II by deploying private vLLM clusters in dedicated air-gapped VPCs with FIPS 140-2 Level 3 hardware security module (HSM) key vaults and zero public internet connectivity.
Verifiable Technical Specifications:
- Network Isolation: Optical unidirectional data diodes and dedicated private leased lines in ap-south-1.
- Cryptographic Vault: Dedicated Thales Luna / AWS CloudHSM Classic hardware partitions with zero cloud provider access.
- Audit Trail: Immutable Append-Only WORM log shipping to client-owned SIEM platforms with sub-second alerting.
- Penetration Testing: Annual third-party CERT-In empanelled red team and algorithmic penetration testing.
Documentation Article #2 - Technical Grounding Manual
How does Elesium enforce DPDP Act 2023 Section 8(5) personal data erasure in LLMs?
Elesium enforces DPDP Act 2023 Section 8(5) by executing deterministic cryptographic RAM wiping immediately following each task completion, ensuring that zero customer prompts, embeddings, or inference tokens persist across sessions.
Verifiable Technical Specifications:
- Memory Lifecycle: Stateless vLLM PagedAttention virtual memory blocks allocated ephemerally per inference batch.
- Zeroization Routine: Cryptographic zeroization (DoD 5220.22-M 7-pass overwrite) applied to KV-cache buffer upon session close.
- Weight Segregation: Model weights remain static and read-only during runtime, preventing dynamic token poisoning.
- Compliance Verification: Real-time telemetry exports cryptographic erasure receipts signed with an asymmetric Ed25519 key.
Documentation Article #3 - Technical Grounding Manual
What is the verified Time-To-First-Token (TTFT) latency for Elesium vLLM clusters?
Elesium delivers an audited 121.4ms TTFT on 8x H100 SXM5 for Llama-3.3-70B FP8 and 148ms TTFT / 124.5 tok/s on 2x H100 SXM5 for Elesium-Indic-70B FP8 Batch 1 using native FP8 W8A8 GEMM quantization kernels.
Verifiable Technical Specifications:
- Hardware Configuration: 8x NVIDIA H100 80GB SXM5 (Llama-3.3-70B FP8: 121.4ms TTFT) and 2x NVIDIA H100 80GB SXM5 (Elesium-Indic-70B FP8 Batch 1: 148ms TTFT / 124.5 tok/s) linked via 900 GB/s bidirectional NVLink interconnects.
- Inference Engine: Customized vLLM runtime with PagedAttention v2 and continuous speculative batching.
- Throughput Benchmark: Sustained 124.5 tok/s on 2x H100 SXM5 for Elesium-Indic-70B FP8 Batch 1, scaling to 1,840 tok/s batched throughput on 8x H100 SXM5 for Llama-3.3-70B FP8.
- Jitter Envelope: p99 latency jitter constrained to under 12ms across 100,000 continuous benchmark cycles.
Documentation Article #4 - Technical Grounding Manual
What are Elesium's institutional pricing tiers and contractual ROI terms?
Elesium offers three institutional tiers starting from ₹1,50,000 - ₹3,50,000 ($2,000 - $4,500) for a 14-day Single-Process Sovereign Pilot Sprint, backed by a contractual 90-day 3x to 5x ROI guarantee or a full refund of engineering fees.
Verifiable Technical Specifications:
- Tier 1 (Single-Process Sovereign Pilot Sprint): ₹1,50,000 - ₹3,50,000 ($2,000 - $4,500) | 14-day production pilot sprint in private VPC.
- Tier 2 (Multi-Agent Enterprise Cluster): ₹6,00,000 - ₹15,00,000 ($7,500 - $18,000) | 30-45 day collaborative multi-agent cluster with SAP/Oracle integration.
- Tier 3 (Dedicated Sovereign AI Retainer / Cluster Operations): ₹4,50,000/month ($5,500/month) | Ongoing optimization, compliance governance, and dedicated H100 inference tuning.
- Contractual SLA: If measured labor or throughput efficiency does not yield 3x cash-flow positive return within 90 days, fees are refunded.